Current Test Results
2026 Radon Re-Test: CMS Woodard Room 121 & 123
Archived Test Results
2018 Radon Re-Test: HS Copy Room
2026 Radon Re-Test: CMS Woodard Room 121 & 123
2018 Radon Re-Test: HS Copy Room
July 8, 2026
Following the installation of a permanent radon mitigation system, the building underwent post-mitigation testing by Cascade Radon, Inc. to verify…
April 8, 2026
As a continuing part of the Corbett School District’s Healthy and Safe Schools Plan, all CSD locations were tested for radon…
December 8, 2020
As a continuing part of the Corbett School District’s Healthy and Safe Schools Plan, locations in the grade school building were…